After accepting and scheduling the scope, check the "In Progress" tab to view assigned scopes. In the event you need to reschedule or change the assigned tech you have the ability to do so.
1. Select “Reschedule” to update. Once the desired time is specified, select "Confirm".
Vendor Administrators: If you wish to assign this walk to an employee or contractor, select the person icon box. Once the desired tech is specified, select "Confirm"
Comments
0 comments
Article is closed for comments.